土业园地 → 欢迎下载欣赏(更新时间:2014年6月19日)

F-036 土业园地 (第036期) 2010.2.22
Field for Artificial Soil TechnologyAST(№036)
作者:李鹏飞 AuthorLi Pengfei February 22, 2010
My Web:www.tuyelt.com Telephone Number:13043864167

人造土壤技术室内试验附图
Figures of artificial soil technology

    注解:1、原料 2、分选车间 3、不可用原料4、外运处理 5、可用原料 6、有机原料7、无机原料 8、半固态有机物 9、固态有机物 10、库房区 11、岩石类 12、建材类 13、粉煤类 14、 矿渣15、砖瓦陶瓷 16、其它库房 17、粉碎车间 18、粉碎研磨车间19、中高温厌氧发酵车间 20、储气罐 21、造土母质库房 22、消毒除臭车间 23、造土堆肥库房24、人造土壤混配车间 25、种植与检测实验室 26、人造土壤库房 27、外销

Fig.1 Flow Diagram of Process of Artificial Soil

Note: 1-raw material, 2-selection workshop, 3-unusable material , 4-treatment by special process outside, 5-useable material, 6-organic material, 7-inorganic material, 8-semi-solid organic matter, 9-solid organic matter, 10-storehouse, 11-a kind of rock, 12-a kind of construction, 13 a kind of coal cinder, 14-slag, 15-brick,tile,pottery and porcelain, 16-storehouse, 17-workshop for cutting solid 18-workshop for pounding and grinding powder, 19-workshop for fermenting in anaerobic condition at medium-high temperature, 20-gas tank, 21-storehouse for parent materials manufacturing soil, 22-workshop for sterilizing and removing smell, 23-storehouse for compost manufacturing soil, 24-workshop for mixing and making of artificial soil, 25-laboratory for planting and examination, 26-storehouse for artificial soil, 27-to sell.

NoteChinese-English bilingual phrase
图二:人造耕地模式图—Fig.2 Sketch of Artificial Cultivated Land
A型、B型、C型、D型、E型—Model A, Model B, Model C, Model D,
Model E,? 山坡度45°—hillside with a slope of 45 degrees, 降水收集区—area gathering precipitation, 排水系统—drainage system, A—
artificial soil, B—gravel, C—rock powder or other buried matter, D—
space water-retaining under ground, E—mountain body, F—waterproof
layer

 
 
 
Copyright © 2009 - 2010 tuyelt.com All Rights Reserved.
人造土壤技术专利 发明人:李鹏飞  联系电话:13043864167
注意:本站人造土壤专利技术禁止用在违反国家法律用途,否则发明人将由法律维权!
辽ICP备09029614号 网站设计制作:辽宁纵横资讯 电话:18804272244